Lot ATG 733 – Camorino – Noise Barriers
Execution period: 2015-2016
ReferenceOn behalf of our client Mancini&Marti SA, at the ATG lot 733 railway construction site (Tombinone alla Bolla – Vigana Portal section), we fabricated and installed noise barriers on both sides of the new railway line (east and west) in order to limit the noise pollution caused by passing trains.
They consist of HEB 160 S235 JR section posts (set in concrete or on base plates), totalling 154 units over a total length of approximately 300 metres.
For this contract we processed 22 tonnes of steel.



Project categories: Tags: Structural steelworkNoise barriers