Traversagna Bridge – Railings
Execution period: 2014
ReferenceCommissioned by Fratelli Somaini SA, which was awarded the contract for the construction of the Traversagna bridge, we produced galvanised steel railings with vertical-bar infill for a total of 60 linear metres and 3 tonnes.
The railings were made of elements following the radius of curvature of the concrete side beams.





Project categories: Tags: Metalwork