References

Consortium PMQ – New SBB Maintenance and Intervention Centre for the Gotthard Base Tunnel – Protective Palisade for the Railway Line

Execution period: 2014-2015

Reference

On behalf of consortium PMQ (made up of the companies Pizzarotti (Suisse) SA, Mancini & Marti SA, Giovanni Quadri SA), we fabricated and installed approximately 400 metres of structural steel palisade to protect the railway line during the construction works for the new SBB maintenance and intervention centre in Biasca.

For this site we supplied and installed all the automated folding doors, with their substructures and canopies, which are presented in the projects section.

Consorzio PMQ – Nuovo Centro di manutenzione e intervento FFS della galleria di base del San Gottardo – Palizzata di protezione della linea ferroviaria
Consorzio PMQ – Nuovo Centro di manutenzione e intervento FFS della galleria di base del San Gottardo – Palizzata di protezione della linea ferroviaria
Consorzio PMQ – Nuovo Centro di manutenzione e intervento FFS della galleria di base del San Gottardo – Palizzata di protezione della linea ferroviaria
Consorzio PMQ – Nuovo Centro di manutenzione e intervento FFS della galleria di base del San Gottardo – Palizzata di protezione della linea ferroviaria

Project categories: Tags: Structural steelwork