AIL SA – Extension of the Administrative Building at the Muzzano Operations Centre – CCC 272 Metalwork
Execution period: 2018-2019
ReferenceFollowing our success in the public tender launched by Aziende Industriali di Lugano (AIL), in 2018 and 2019 we carried out the metalwork for the extension of the administrative building at the Muzzano operations centre. Specifically, our work comprised enlarging the existing emergency staircase and fully enclosing it (cladding) with perforated aluminium sheets, railings, handrails (with LED inserts) and the entrance vestibule of the administrative building.


Project categories: Tags: Structural steelworkMetalworkFaçade cladding and roofing