Rehabilitation of the Bridge over the Rierna – Personico

Execution period: 2020

Reference

As part of the rehabilitation project for the bridge over the Rierna in Personico, we built the load-bearing structure of the bridge in structural steelwork, weighing a total of approximately 16 tonnes over an overall length of 22 metres.

The structure was pre-assembled in the workshop and transported in one piece to the site, where it was installed with the aid of a 100-tonne mobile crane. Since 12 July the bridge has been open to road traffic again.