References

New Cadenazzo Recycling Centre – Canopy, Walkways and Sliding Gate

Execution period: 2017

Reference

Following our success in the public tender launched by the Municipality of Cadenazzo for the construction of the new recycling centre, we fabricated and erected the structural steel canopy with its insulated-panel cladding and roofing, the walkways above the tanks and the automated double-leaf entrance gate. The engineering firm BRC of Agno was responsible for the design and site supervision.

The total weight of the canopy's structural steelwork amounts to approximately 11.5 tonnes, and approximately 300 m² of roofing and façade cladding were installed.

The recycling centre has been open to the public since July 2017.

Nuovo Ecocentro di Cadenazzo – Tettoia, passerelle e cancello scorrevole

Project categories: Tags: Structural steelworkMetalworkFaçade cladding and roofing